Installation, Test and Commission of new Unit Control Panels, Field Instrumentation, MCCs, and Cabling of 3 Gas Turbine driven Pumps at Zubair-1 Oil Depot
Installation, Test and Commission of new Unit Control Panels, Field Instrumentation, and Cabling of 3 Gas Turbine driven Pumps at PS-1 Oil Depot
Design, Installation and commissioning of new Radar Level Measuring System for Seven Fuel Tanks of Nassrya Thermal Power Production Station
GE Mark V control system document review, wiring, testing and commissioning support of Al-Najaf New Gas Turbine Power Production Station (2 X 125 MW)
Document review, cabling, testing, and commissioning support for OVATION® Distributed Control System of New Sulaimanyia Gas Turbine Power Production Station (4 X 125 MW), Unit No. 3, 4, 5, 6, 7 and 8.
Design, Supply, Installation and Commissioning of a Burner Management System BMS and Field equipment supply and rehabilitation for Two thermal generation units (Unit No.2 and Unit No.3) at Baiji Thermal Power Production Station
Design, Supply, Installation and Commissioning of a Turbine Supervision Instrumentation System TSI for Two thermal generation units at Baiji Thermal Power Production Station
Design, Supply, Installation and Commissioning of a Data Logger System for all thermal generation units at Thermal Power Production Station (6 X 220 MW)
Rehabilitation, maintenance and commissioning of control system (Siemens STEP7-300 PLC) of the water treatment unit at South Baghdad Power Production Station
Rehabilitation and Upgrade of Cement, Raw Materials, Crusher and Kiln weighing feeders of Kubaisa cement factory (All feeders)
Design, Supply, Installation and commissioning of new Kiln and Cooler motor drive system.
Design, supply, installation and commissioning of new automatic crusher mixing control system
Rehabilitation and Upgrade of Cement, and Kiln weighing feeders of Kirkuk cement factory (Six feeders)
Retrofitting, installation and commissioning of new 250 Ton/hr schenk weighing feeders of Kirkuk cement plant kilns.
Design, retrofitting and commissioning of new control system, drives and instruments of Fallujah cement plant Stacker and Reclaimer machines.
Replacement of all SCADA equipment at Central Region of Electrical Power Generation and Transmission of Iraq
Commissioning of all new SCADA equipment at Southern Region of Electrical Power Generation and Transmission of Iraq
New RTU Modules, PLC Link addition and interfacing to existing south SCADA center
Design, Program development, Installation and Commissioning of a Center to Center Communication Module based on ICCP TASE 2.0 link between Mosul Dam Control Center and the NDC SCADA (Iraqi National Dispatch Center)
127 GSM Sites, Work involves: Site acquisition and planning, Civil work supervision. Electrical, Control works, and Telecomm erection and commissioning.
Ericsson RBS & BBS 2000 Generation,
Ericsson BBS, and Kathrein Azimuth antenna. Ericsson Minilink E Series PDH MW Links Minilink MW compact antenna, and Ericsson Radio RAU (15/25/21 GHz, 18/25/21 GHz, 18/35/31 GHz, and 38 GHz).
88 Backbone sites, 2 STM1 XPIC 1+1 configuration. Work involves: Site acquisition and planning, Civil work and Heavy Load Tower construction. Electrical, Control and Telecomm works implementation and commissioning.
Ericsson GSM RBS & BBS 2000 Generation V2, and Kathrein Azimuth Dual Band antenna. Ericsson Minilink TN Series MW SDH Links, Minilink MW 2.5m antenna, Ericsson Radio RAU (6 GHz, 7 GHz, and 8 GHz). and Ericsson Minilink E Series PDH MW Links Minilink MW compact antenna, and Ericsson Radio RAU (15/25/21 GHz, 18/25/21 GHz, 18/35/31 GHz, and 38 GHz).
21 GSM Sites, Work involves: Site acquisition and planning, Civil work implementation. Electrical, Control works, and Telecomm erection and commissioning.
Ericsson RBS & BBS 2000 Generation,
Ericsson BBS, and Kathrein Azimuth antenna. Ericsson Minilink E Series PDH MW Links Minilink MW compact antenna, and Ericsson Radio RAU (15/25/21 GHz, 18/25/21 GHz, 18/35/31 GHz, and 38 GHz).
18 GSM Sites, Work involves: Site acquisition and planning, Civil work implementation. Electrical, Control works, and Telecomm erection and commissioning.
Ericsson RBS & BBS 2000 Generation,
Ericsson BBS, and Kathrein Azimuth antenna. Ericsson Minilink E Series PDH MW Links Minilink MW compact antenna, and Ericsson Radio RAU (15/25/21 GHz, 18/25/21 GHz, 18/35/31 GHz, and 38 GHz).